1. Basics of VSM
Value Stream Mapping is presented as a method for understanding how value and waste move through production processes. The section defines VSM, explains its role in process improvement, and distinguishes value-added work from the seven common categories of loss.
- definition and significance of Value Stream Mapping (VSM),
- the role of VSM in improving production processes and eliminating waste,
- examples of added value and various forms of waste (7 types of losses).
2. Essential tools and concepts in VSM
Key VSM tools and indicators form the analytical language used throughout the mapping exercise. The section clarifies the main instruments applied in practice and explains the metrics needed to assess process performance, compare states, and support improvement priorities.
- discussion of key tools,
- explanation of important indicators.
3. Preparation for mapping
Effective VSM starts with disciplined data collection and a shared reading of mapping notation. Participants prepare for gathering production information and learn the symbols used in current state mapping, so later analysis is based on consistent observations and correctly documented flow.
- tips on preparing for collecting production data,
- discussion of the symbols used in current state mapping.
4. Analysis of the current state of production processes
Before mapping begins, the actual production environment must be understood well enough to choose a meaningful scope. This section covers getting familiar with the processes, selecting areas for mapping, and collecting and verifying additional data needed for reliable analysis.
- familiarization with production processes,
- selection of areas for mapping,
- collection of additional data and verification of the collected information.
5. Analysis of mapping results
Based on the collected production data, participants translate observations into a current state map that makes process flow visible. The work then moves to identifying waste and calculating key indicators, providing a factual basis for later redesign and improvement decisions.
- drawing the current state map based on the collected data,
- identification of losses in the process and calculation of key indicators.
6. Theoretical foundations of future state design
Designing a future production state requires clear rules for flow organization and the right Lean mechanisms. This part explains how the target process is shaped and introduces pull system tools and Lean techniques that support a more stable and responsive value stream.
- design of the future state of the production process,
- introduction to pull system tools and Lean techniques.
7. Creation and analysis of the future state map
At this stage, future state maps are built for selected product families and used to structure the target production flow. Attention is placed on improvement proposals and on evaluating the benefits expected after implementation, including the operational impact of the planned changes.
- creation of the future state map for selected product families,
- proposals for improvements and analysis of potential benefits after implementing changes.
8. Simulation of improved processes
Using the designed future state map, the group runs a simulation to test how the improved process performs in practice. The section focuses on comparing operating results before and after optimization, turning proposed changes into measurable effects rather than assumptions.
- conducting a simulation based on the designed future state map,
- comparison of results before and after process optimization.
9. Summary
Final maps serve here as the basis for consolidating workshop outcomes and reviewing what changed across the value stream. The summary links completed deliverables with the results obtained, so participants can clearly interpret the effects of the analyses, design work, and simulations.
- final maps and a summary of the obtained results.